Bibemi Gallery
-
Oriole’s CEO Martin Rosser and Country Manager Stephen Chia, along with local partner Emmanuel Kouokam (BEIG3), are introduced to the Prime Minister by the Deputy British High Commissioner to outline Oriole’s exploration progress in Cameroon, in particular the advancement of the Bibemi and Mbe projects
-
Oriole’s CFO Bob Smeeton presenting the financial case for the Bibemi project to representatives across the Cameroonian government, chaired by the Director General of SONAMINES
-
Indicated and Inferred Resource Estimate block model for BZ1-MRE, constrained by a US$2,750/oz pit shell
-
Oblique, 3D view of the BZ1-MRE block Model, coloured by grade
-
Ground magnetic Total Magnetic Intensity (reverse to pole) image over the key prospects at Bibemi
-
Exploration Manager Abdoul Mbodji and Executive Director of Exploration an Business Development Claire Bay present and discuss Phase 4 drill core rig-side with former Minister of Mines Gabriel Ndoke and a delegation from the Ministry of Mines
-
Exploration Manager Abdoul Mbodji presenting a section of quartz vein drill core to former Mining Minister Gabriel Ndoke and other delegates from the Ministry of Mines
-
Drill core from BBDD050 – part of the high-grade 14.80m at 4.27 g/t Au intersection
-
Visible centimetre scale sulphides within a single milky white quartz vein
-
Core box logging tables at the Bibemi drill camp
-
Conducting structural measurements of Bibemi core material using a kenometer
-
Pervasive silicification and sulphidation of tonalite host rock, with quartz-tourmaline veining
-
Micro-scale structures reflect the regional setting – sulphides observed at structrual intersections
-
Removal of diamond core from the core barrel
-
Phase 2 drilling at Bakassi Zone 1
-
Sunset at the Bibemi camp
-
Team reviews the core from hole BBDD-004
-
Removal of core from barrel
-
Drilling at Bakassi Zone 1
-
Maiden Drilling at Bibemi
-
Bibemi drill camp. Accommodation constructed with repurposed shipping containers, source in-country
-
Artisanal mining pits at Lawa East, exposing shear- and extensional-related quartz veining
-
Artisanal mining pits at Lawa East targeting near-surface quartz vein material
-
Mechanical trench digging at Bakassi
-
Mapping of trench wall at Bakassi
-
Marking-out trench sample intervals at Bakassi
-
Trench sampling at Bakassi
-
Cameroon team overseeing trench digging at Bakassi
-
Field mapping at Bibemi
-
Quartz vein grading >100 g/t Au, from northern end of Bakassi Zone 1
